 What is a hook-up?
Briefly speaking, it is the business phase between construction and start up, which refers to all the necessary activities or operations that are required before the first oil in a production unit platform such as FPSO or Fixed platform.
More specifically, it can be divided into tasks above sea and below sea.
Construction of the remaining tasks or offshore items that need to be installed after arriving on the spot, or installation of riser, cable, etc. Where jacket is installed, the module is mounted and the operation of connecting related utilities can also be included in HOOK-UP.

키워드

HOOK-UP,   OFFSHORE,   HUC,   COMMISSIONING,   SUBSEA,   RISER,   MOORING,   FPSO
  • 가격80,000
  • 페이지수3페이지
  • 등록일2016.12.12
  • 저작시기2016.12
  • 파일형식기타(docx)
  • 자료번호#1014497
본 자료는 최근 2주간 다운받은 회원이 없습니다.
청소해
다운로드 장바구니