|
EXPERIENCES
Xxx Consulting MAR 2007~PRESENT
Ooo Engineering (Apr.2007~Jul.2007) Performance management structure foundation project
Developed KPIs to measure intangible capability and made performa
|
- 臧瓴 1,000鞗
- 霌彪鞚 2010.06.07
- 韺岇澕膦呺 鞗岆摐(doc)
- 歆侅甑秳 旮绊儉
|
|
structure, rib, spar, fraem.etc.
• Drawing check and release.
• Drawing note control
• Standard part modeling such as rivet, bolt etc
• Prepared PDM (Engineering BOM Release System) user鈥檚 guideCatia file management check list 氇╈皑
1.鞓侂鞚措牓靹
2.Cover letter
|
- 臧瓴 800鞗
- 霌彪鞚 2010.02.09
- 韺岇澕膦呺 鞗岆摐(doc)
- 歆侅甑秳 旮绊儉
|